麻豆人妻无码性色AV专区,亚洲AV极品无码专区在线观看,18禁美女黄网站色大片在线,秋霞无码久久久精品,宅男噜噜噜66网站在线观看,真人无码作爱免费视频网站,中国亚州女人69内射少妇,丝袜美腿亚洲一区二区,少妇高潮无套内谢麻豆传,国产精品无码AV片在线观看播

<center id="ojlzu"></center>
<rt id="ojlzu"></rt>
    <rt id="ojlzu"></rt>
  1. <rt id="ojlzu"></rt>
      1. Wuxi Gotele Metal Products Co., Ltd : CN EN
        Home >>News >>News of Construction and Building

        Golden Gate Bridge: an Exceptional piece of Steel Engineering



        San Francisco’s Golden Gate Bridge is one of the most iconic bridges in the world. It is a so-called suspension bridge: the deck is supported by vertical cables attached to upper larger cables, which -in turn- extend between supporting towers and are anchored at the ends.


        The bridge’s construction begun in 1933 and gave chances of employment during the US’s Great Depression. The design was assigned to engineer Joseph Strauss. The constructions time took 4 years costing $35 million and featuring some extreme scenarios.


        For example, 3.25 million cubic feet (92,030 cubic metres) of soil excavations were required for establishing the bridge’s anchorages and they are 12-floors tall! The divers had to submerge as deep as 90 feet (27.4 m) in the water to explode rocks and then remove the debris! Despite such difficulties, the bridge finally opened in 1937.


        On-site construction of the suspension cables began in 1935. All the bridge’s cables are made of galvanized carbon steel wires and they were laid by a ‘spinning’ technique.


        The two main cables alone account for 61,500 tons of weight load on the two 746-ft-tall (227 m) towers! The wires pass on top of the towers and are secured at each end in massive anchorages. The main cables measure 36.22 inches in diameter and they extend for 7,650 ft (2,332 m) each!


        Such massive cables were manufactured by grouping together 61 bundles of wire. In turn, each of these is made up of 452 smaller wires, for a total of 27,572 cables! As for the vertical suspended cables, they tie the bridge’s deck to the main cables. There are 250 pairs of them; they are spaced 50 feet apart from each other and measure from 2 to 16 inches in diameter.  All of the vertical ropes were replaced between 1972 and 1976.


        It is interesting how the Golden Gate Bridge ‘dances’ up and down depending on the temperature. Hot days with high temperature cause the metal to expand; steel cables elongate and the bridge’s deck lowers. This is especially visible in its central part. Moreover, painting the ‘Red Bridge’ is a non-stop task and of primary importance. In fact, the paint applied to the steel prevents both corrosion and rust that the air with high salt content in may cause.


        At Wuxi Gotele Metal Corporation we are passionate about bridges engineering and infrastructure technologies. With the help of our experts we proudly supply products such as Steel Truss Bridge, Diagonal Span Arch Bridge and Compact Panel Bridge. For further information and a full list of products, please click here.

        HomeTelProductsContact
        CN EN
        中文字幕精品人妻av在线| 国产一区二区三区在线观看日韩| 色婷婷综合久久久中文字幕| 男人天堂av成人在线| 亚洲欧美韩日国产一区二区| 亚洲熟妇无码AV不卡在线| 国产精品剧情一区二区三区av| 一区二区三区四区四色av| 97超碰精品成人国产| 偷窥偷拍原味一区二区| 欧美熟女少妇一区二区三区| 日韩高清不卡中文字幕| 久久久亚洲女精品aa| 久久永久免费人妻精品下载| 国产欧美日韩精品第一| 国家精品一区二区三区| 国产精品人成在线观看| 久久99精品福利久久久久久| 国产激情视频免费观看| 天堂免费精品专区国产日韩| 欧美熟妇与小伙性欧美交| 黄色av网站免费在线看| 熟女快要高潮了在线观看| av熟女一区二区久久| 亚洲av免费成人在线| 中日韩字幕中文字幕一区| 国产精品三级伦理在线观看| 亚洲国产av系列精品麻豆| 男人的天堂成人精品一区二区三区| 欧美亚洲综合国产精品| 国产av一区二区三区久久精品| 国产三级国产精品三级| 日本亚洲一级中文字幕| 日本成人免费一区二区三区 | 国产日韩欧美另类在线视频| 99久久综合精品二区| 熟女系列丰满熟妇av| 精品人妻一区二区三区免费观看| 免费在线观看播放av| 日本少妇一区二区高清| 日本啪啪视频一区二区|