麻豆人妻无码性色AV专区,亚洲AV极品无码专区在线观看,18禁美女黄网站色大片在线,秋霞无码久久久精品,宅男噜噜噜66网站在线观看,真人无码作爱免费视频网站,中国亚州女人69内射少妇,丝袜美腿亚洲一区二区,少妇高潮无套内谢麻豆传,国产精品无码AV片在线观看播

<center id="ojlzu"></center>
<rt id="ojlzu"></rt>
    <rt id="ojlzu"></rt>
  1. <rt id="ojlzu"></rt>
      1. Wuxi Gotele Metal Products Co., Ltd : CN EN
        Home >>News >>News of Construction and Building

        Golden Gate Bridge: an Exceptional piece of Steel Engineering



        San Francisco’s Golden Gate Bridge is one of the most iconic bridges in the world. It is a so-called suspension bridge: the deck is supported by vertical cables attached to upper larger cables, which -in turn- extend between supporting towers and are anchored at the ends.


        The bridge’s construction begun in 1933 and gave chances of employment during the US’s Great Depression. The design was assigned to engineer Joseph Strauss. The constructions time took 4 years costing $35 million and featuring some extreme scenarios.


        For example, 3.25 million cubic feet (92,030 cubic metres) of soil excavations were required for establishing the bridge’s anchorages and they are 12-floors tall! The divers had to submerge as deep as 90 feet (27.4 m) in the water to explode rocks and then remove the debris! Despite such difficulties, the bridge finally opened in 1937.


        On-site construction of the suspension cables began in 1935. All the bridge’s cables are made of galvanized carbon steel wires and they were laid by a ‘spinning’ technique.


        The two main cables alone account for 61,500 tons of weight load on the two 746-ft-tall (227 m) towers! The wires pass on top of the towers and are secured at each end in massive anchorages. The main cables measure 36.22 inches in diameter and they extend for 7,650 ft (2,332 m) each!


        Such massive cables were manufactured by grouping together 61 bundles of wire. In turn, each of these is made up of 452 smaller wires, for a total of 27,572 cables! As for the vertical suspended cables, they tie the bridge’s deck to the main cables. There are 250 pairs of them; they are spaced 50 feet apart from each other and measure from 2 to 16 inches in diameter.  All of the vertical ropes were replaced between 1972 and 1976.


        It is interesting how the Golden Gate Bridge ‘dances’ up and down depending on the temperature. Hot days with high temperature cause the metal to expand; steel cables elongate and the bridge’s deck lowers. This is especially visible in its central part. Moreover, painting the ‘Red Bridge’ is a non-stop task and of primary importance. In fact, the paint applied to the steel prevents both corrosion and rust that the air with high salt content in may cause.


        At Wuxi Gotele Metal Corporation we are passionate about bridges engineering and infrastructure technologies. With the help of our experts we proudly supply products such as Steel Truss Bridge, Diagonal Span Arch Bridge and Compact Panel Bridge. For further information and a full list of products, please click here.

        HomeTelProductsContact
        CN EN
        日韩精品一区二区三区四区| 中文字幕一区二区三在线| 精品福利视频一区二区| 青青草青娱乐在线视频| 丝袜美腿爆炒国产在线观看| 国产一区二区三区4区| 自拍偷拍二区日韩av| 日韩欧美一区二区三区免费观看| 中文第激情无激情码激情| 一本色道久久综合狠狠躁中文| 国产美女黄性色av网站| 国产精品自拍视频免费| 男人天堂av成人在线| 美女福利一区二区三区在线观看| 人妻丝袜中文字幕久久| 亚洲人妖女同在线播放| 一区二区三区不卡国产| 亚洲欧美丝袜人妻色图一区| 在线观看免费午夜精品| 久草热视频这里有精品| 国产三级黄色的在线观看| 国产精品无码一二区免费| 精品国产一级二级三级| 国产精品中文字幕有码| 国产成人精品日韩在线| 亚洲国产成人精品日本| 在线观看黄片在线播放视频| 亚洲中文字幕国产av| 日韩人妻高清福利视频| 国产极品欧美美女在线| 亚洲av丝袜美腿一区| 日本免免费高清一区二区三区| AV免费网站在线观看| 岛国精品免费在线观看| 中文人妻少妇精品乱又伦| 一区二区三区国产日本| 天天噜噜噜在线视频| 欧洲亚洲精品免费二区| 一区二区欧美精品日韩| 亚洲精品自拍区自拍区| 337P日本欧洲亚洲大胆人人|